Tuesday, September 26th, 2006
Stockings and bathrooms
Nate fixed it so I can upload pictures this morning, but I still can’t update my sidebar. I’m anxious to show a few things.
This is Veronica’s stocking, as of Friday. I decided to do use heel stitch on the heel, even though it isn’t necessary since it isn’t going to be worn. I’ve always liked the look and feel of heel stitch, and I think it looks great on the stocking, which I want to look like a sock anyway.
The floor in the background is our new bathroom floor as of Friday as well. It was finally grouted on Thursday, and when this picture was taken, the grout was still damp. So it is much lighter now.
They still need to seal the stone, and I’m not sure when that’s going to happen. The fixtures will go on after it’s sealed. Our shower door and mirror get delivered and installed on Friday. We need to paint… so it’s going to be at least a week before we can start using our bathroom.
I was finally able to pick up another set of circular needles for Olivia. She’s been impatient to start her own stocking, and now is very happy.
I’m letting her pick her striping colors. I think hers is going to be wild and colorful. Just like she is.